Railway
Wan Chai MTR Station
Completed Project
Building on its success with the MTR Corporation, a Dragages joint venture was tasked with constructing a station concourse to link the existing underground network with a pedestrian subway under the busy streets of the Wan Chai district.
Using a top-down method and a 1.2-metre thick diaphragm wall, the station was constructed 26 metres below street level.
Client | MTR Corporation |
Joint-venture project | Construction of a station concourse |
Construction period | 1982 - 1985 |