Government Quarters at West Kowloon
Completed Project
Precast walls maximise efficiency and quality
To design and build the two 37-storey residential towers, a mechanised construction method was again used that involved precast concrete elements.
A precast internal wall system was introduced for this project. Electrical conduit and sockets were cast into the walls, enhancing the quality of the works and minimising wet trades after structural works.
Similar to the project in Lai King, such construction approach enabled quality finishing works and at the same time reduced waste and created a safer working environment.
Client | Architectural Services Department, Hong Kong Government |
Project | Design and build two 37-storey towers housing 540 units |
Floor area | 38,500 square metres |
Construction period | 1999 - 2002 |