Educational Institution
Tseung Kwan O – Primary and Secondary Schools
Completed Project
Initiatives to improve quality, reduce wastage
In a bid to improve construction quality, shorten construction time and reduce material wastage, the Government launched an innovative pilot scheme for the construction of five schools in Tseung Kwan O.
Dragages opted to use pre-cast elements and in-situ concrete to form the integral structure. Over 80 percent of the in-situ structures were cast using steel formwork, reducing construction waste and eliminating the need for plastering before painting.
The combined use of various construction techniques not only minimised waste and enhanced quality, construction time of a classroom block’s superstructure was also reduced by almost a month and a half.
Client | Architectural Services Department, Hong Kong Government |
Project | Design and build 2 primary schools and 3 secondary schools |
Floor area | 37,500 square metres |
Construction period | 1997 - 1999 |